GoPlanSets

Governed engineering intelligence

Rules with sources.
Unknowns that stay unknown.

GoPlanSets is building a dated California jurisdiction registry and a testable electrical-engineering rule library. Nothing becomes an export rule until its authority, applicability, boundary tests, and independent review are recorded.

540California AHJs identified
58Counties represented
19Electrical rule families seeded
1AHJ in active deep review

Coverage model

An inventory is not a rule pack

All California city and county authorities can be listed without pretending their requirements have been researched. Each authority moves through unverified, researching, reviewed, released, and stale states. Only a released, effective-dated pack can unlock a permit export.

  1. 01IdentifyOfficial jurisdiction identity and domain
  2. 02SourceCurrent forms, bulletins, code cycle, portal, fire and utility requirements
  3. 03ModelApplicability, calculations, geometry, required evidence, and forms
  4. 04AttackBoundary tests, stale-note detection, contradictory-sheet mutations
  5. 05ReleaseQualified review bound to exact rule, template, and source hashes

Electrical knowledge domains

01

Equipment listing and manufacturer instructions

Source mapped
02

Service and supply-side connections

Source mapped
03

Overcurrent protection and coordination

Review queue
04

Grounding and bonding

Review queue
05

Wiring methods, ampacity, correction, and adjustment

Review queue
06

Load-side interconnection topology

Review queue
07

PV maximum voltage and source current

Review queue
08

MPPT and string compatibility

Review queue
09

Rapid shutdown and marking

Review queue
10

Energy storage protection, control, and siting

Review queue
11

Residential roof structure and fire access

Review queue
12

Artifact reconciliation and immutable review

Review queue

Plan anatomy control map

Every region has one owner.

We decomposed the reference corpus into 111 atomic drawing and reconciliation regions. Each has a dedicated skill, a unique knowledge contract, property and authority inputs, applicability logic, evidence requirements, and hard-fail checks. A mapped legacy block is only a migration lead—not proof that the region is release-ready.

111Atomic regions
111Dedicated skills
90Legacy block leads
21Visible renderer gaps
01
EvidenceMeasured property facts + exact equipment
02
AuthorityReleased AHJ, utility + fire overlays
03
Compose111 owned page regions
04
ReconcileEight cross-sheet truth checks
05
ReleaseHard gates, editable output + PDF

Skill-library checklist

14 page families · version 2026.09.07

Coarse block mappedRenderer ownership pending
ALLEvery sheet · controlled chrome*7/7 mapped
001

Sheet border and registration

Keep the printable frame, trim-safe area, orientation, and registration consistent on every sheet.

sheet-border-registration · gps-sheet-border-registration · 3 blocker checks
002

Project identity block

Print one canonical project identity without stale customer or sample data.

title-block-project-identity · gps-title-block-project-identity · 3 blocker checks
003

Contractor identity block

Render the correct contractor/company identity and optional user-supplied brand assets.

title-block-contractor-identity · gps-title-block-contractor-identity · 3 blocker checks
004

Designer and credential block

Identify the author/reviewer and credential status without implying an absent stamp.

title-block-designer-credential · gps-title-block-designer-credential · 3 blocker checks
005

Sheet identity block

Bind sheet id, title, sequence and total to the dynamic sheet ledger.

title-block-sheet-identity · gps-title-block-sheet-identity · 3 blocker checks
006

Revision control block

Carry one immutable revision through every sheet and artifact.

title-block-revision-control · gps-title-block-revision-control · 3 blocker checks
007

Content and source signature

Expose the deterministic content/source signature used for traceability.

title-block-source-signature · gps-title-block-source-signature · 3 blocker checks
T-1T-1 · cover and project basisT-112/12 mapped
008

Document title and project class

State the exact project/scope class using controlled terminology.

cover-document-title · gps-cover-document-title · 3 blocker checks
009

System capacity headline

Present reconciled DC, AC, storage and EV ratings at first glance.

cover-system-capacity · gps-cover-system-capacity · 3 blocker checks
010

Owner and site identity

Present the correct owner/project label and site location.

cover-property-owner · gps-cover-property-owner · 3 blocker checks
011

Project data table

Summarize APN, occupancy, construction, stories, authority, utility and document status.

cover-project-data · gps-cover-project-data · 3 blocker checks
012

Design criteria table

State property-specific structural/environmental design values with their basis.

cover-design-criteria · gps-cover-design-criteria · 3 blocker checks
013

Applicable code basis

List the effective adopted codes and amendments for the exact authorities.

cover-code-basis · gps-cover-code-basis · 3 blocker checks
014

Interconnection basis

State the exact utility, tariff/program path and POI method.

cover-interconnection-basis · gps-cover-interconnection-basis · 3 blocker checks
015

Scope of work

Describe only the equipment and work actually included, existing, relocated or excluded.

cover-scope-of-work · gps-cover-scope-of-work · 3 blocker checks
016

Existing and proposed service summary

Expose service voltage, bus, main, upgrade and interconnection state.

cover-service-summary · gps-cover-service-summary · 3 blocker checks
017

Roof and racking summary

Summarize roof material, pitch, framing, racking, loads and attachment basis.

cover-racking-summary · gps-cover-racking-summary · 3 blocker checks
018

Dynamic drawing index

List exactly the applicable composed sheets and appendices in issue order.

cover-sheet-index · gps-cover-sheet-index · 3 blocker checks
019

Aerial and location context

Orient the reviewer to the site without using provider imagery outside licensed rights.

cover-aerial-location · gps-cover-aerial-location · 3 blocker checks
T-2T-2 · project-specific notesT-28/8 mapped
020

Project and scope notes

Generate project-specific general notes that agree with the actual scope.

notes-project-scope · gps-notes-project-scope · 3 blocker checks
021

Site and building notes

Record existing building/site conditions and field-verification duties.

notes-site-building · gps-notes-site-building · 3 blocker checks
022

Equipment location notes

Coordinate placement, access, working space and protection for each exact device.

notes-equipment-location · gps-notes-equipment-location · 3 blocker checks
023

Structural notes

State verified framing, attachment and engineering conditions without generic overreach.

notes-structural · gps-notes-structural · 3 blocker checks
024

Wiring and conduit notes

Coordinate wiring methods, routing, fill, protection and environmental conditions.

notes-wiring-conduit · gps-notes-wiring-conduit · 3 blocker checks
025

Grounding and bonding notes

Describe the actual grounding/bonding scheme and equipment instructions.

notes-grounding-bonding · gps-notes-grounding-bonding · 3 blocker checks
026

Disconnect and overcurrent notes

State accessible disconnect, OCPD and grouping responsibilities for this topology.

notes-disconnect-ocpd · gps-notes-disconnect-ocpd · 3 blocker checks
027

Manufacturer and field coordination

Bind installation to exact manufacturer instructions and documented field verification.

notes-manufacturer-coordination · gps-notes-manufacturer-coordination · 3 blocker checks
PV-1PV-1 · site, roof, equipment and access planPV-19/11 mapped
028

Parcel and property context

Show the legal/site context needed to locate the work without fabricating survey precision.

site-parcel-boundary · gps-site-parcel-boundary · 3 blocker checks
029

Measured building footprint

Draw the current building footprint and roof relationship in physical units.

site-building-footprint · gps-site-building-footprint · 3 blocker checks
030

Roof and array context

Locate roof planes, arrays and existing/proposed distinctions on the site.

site-roof-array-context · gps-site-roof-array-context · 3 blocker checks
031

North, scale and orientation

Bind the printed north/scale to the same transform that places geometry.

site-north-scale · gps-site-north-scale · 3 blocker checks
032

Equipment locations and callouts

Place meter, service, panels, disconnects, inverter, ESS and EVSE from evidence.

site-equipment-locations · gps-site-equipment-locations · 3 blocker checks
033

Conductor and conduit routes

Show measured/controlled DC, AC, control and service route intent.

site-conductor-routes · gps-site-conductor-routes · 3 blocker checks
034

Fire access, pathways and setbacks

Render property- and authority-specific access/pathway geometry.

site-fire-access-pathways · gps-site-fire-access-pathways · 3 blocker checks
035

Obstructions and openings

Locate vents, skylights, chimneys, windows, doors, gas equipment and hazards that affect design.

site-obstructions-openings · gps-site-obstructions-openings · 3 blocker checks
036

Site dimensions and clearances

Dimension the controlling property, equipment, access and setback relationships.

site-dimensions-setbacks · gps-site-dimensions-setbacks · 3 blocker checks
037

Legend and callout vocabulary

Use one consistent project-specific symbol/line/hatch vocabulary.

site-legend-callouts · gps-site-legend-callouts · 3 blocker checks
038

Plan-specific construction notes

Place concise notes beside the affected work rather than relying only on boilerplate.

site-construction-notes · gps-site-construction-notes · 3 blocker checks
PV-1.1PV-1.1 · commercial array/string segmentationPV-1.1 or continuation PV-*0/4 mapped
039

Commercial array segmentation

Separate arrays by roof zone, voltage class, inverter and operational grouping.

commercial-array-segmentation · gps-commercial-array-segmentation · 3 blocker checks
040

String and optimizer map

Map each module/optimizer to a string, MPPT and inverter on large systems.

commercial-string-map · gps-commercial-string-map · 3 blocker checks
041

Inverter and AC grouping

Show inverter/combiner grouping and phase/service relationships.

commercial-inverter-grouping · gps-commercial-inverter-grouping · 3 blocker checks
042

Roof zone and continuation key

Keep multi-sheet roof plans navigable with match lines and stable zone ids.

commercial-roof-zone-key · gps-commercial-roof-zone-key · 3 blocker checks
PV-2PV-2 · measured array and attachment layoutPV-27/8 mapped
043

Roof plane geometry

Compose measured roof planes, edges, ridges, hips, valleys and eaves as vectors.

roof-plane-geometry · gps-roof-plane-geometry · 3 blocker checks
044

Azimuth, pitch and plane identity

Label each roof plane with measured orientation, pitch and stable id.

roof-azimuth-pitch · gps-roof-azimuth-pitch · 3 blocker checks
045

Module placement geometry

Place exact-dimension modules in constructible rows on allowed roof regions.

roof-module-layout · gps-roof-module-layout · 3 blocker checks
046

String or branch mapping

Visually associate every module with its string, branch or optimizer group.

roof-string-branch-map · gps-roof-string-branch-map · 3 blocker checks
047

Rafter and framing grid

Render field-verified framing direction, spacing, member size and relevant supports.

roof-rafter-framing · gps-roof-rafter-framing · 3 blocker checks
048

Attachment layout

Place exact attachment count/locations relative to framing and racking spans.

roof-attachment-layout · gps-roof-attachment-layout · 3 blocker checks
049

Roof setbacks and clearances

Render applicable fire, ridge, valley, edge and obstruction clearances.

roof-setbacks-clearances · gps-roof-setbacks-clearances · 3 blocker checks
050

Roof dimensions and drawing scale

Dimension controlling edges, arrays, attachments and pathways at a true scale.

roof-dimensions-scale · gps-roof-dimensions-scale · 3 blocker checks
PV-3PV-3 · structural and mounting detailsPV-37/7 mapped
051

Transverse racking section

Show the exact module, clamp, rail, mount, flashing, roof and framing stack across slope.

racking-transverse-section · gps-racking-transverse-section · 3 blocker checks
052

Longitudinal racking section

Show rail spans, supports, cantilevers and attachment spacing along the array.

racking-longitudinal-section · gps-racking-longitudinal-section · 3 blocker checks
053

Racking top plan detail

Show rail seams, clamps, attachments, grounding and module relationships from above.

racking-top-plan · gps-racking-top-plan · 3 blocker checks
054

Transverse attachment detail

Resolve waterproofing, fastener embedment, edge distance and framing engagement.

attachment-transverse-detail · gps-attachment-transverse-detail · 3 blocker checks
055

Longitudinal attachment detail

Resolve roof-course orientation, mount placement and longitudinal fastener constraints.

attachment-longitudinal-detail · gps-attachment-longitudinal-detail · 3 blocker checks
056

Structural material/detail key

Provide a complete numbered key for every material and component shown.

structural-material-key · gps-structural-material-key · 3 blocker checks
057

Attachment and load schedule

Tabulate roof plane, attachment count, spacing, spans and governing loads.

attachment-schedule · gps-attachment-schedule · 3 blocker checks
E-1E-1 · electrical one-line topologyE-1, E-1.1, E-1.2 continuation as needed10/10 mapped
058

PV/ESS/EV source circuits

Represent each independent source/load circuit with correct professional symbols.

one-line-source-circuits · gps-one-line-source-circuits · 3 blocker checks
059

Junctions, branches and homeruns

Keep strings/branches distinct through junctions, transitions and homeruns.

one-line-junction-homeruns · gps-one-line-junction-homeruns · 3 blocker checks
060

Rapid shutdown/control path

Represent RSD and communications as control functions, not fictitious power sources.

one-line-rsd-control · gps-one-line-rsd-control · 3 blocker checks
061

Inverter and conversion equipment

Show exact conversion devices, ports, MPPTs, voltage classes and ratings.

one-line-inverter-conversion · gps-one-line-inverter-conversion · 3 blocker checks
062

ESS and backup branch

Show storage, controls, backup switch/gateway and backed-up loads in the correct power path.

one-line-ess-branch · gps-one-line-ess-branch · 3 blocker checks
063

Disconnects and OCPD

Place and rate all breakers, fuses and disconnects in proper sequence.

one-line-disconnect-ocpd · gps-one-line-disconnect-ocpd · 3 blocker checks
064

Panels, buses and load-side limits

Represent existing/proposed panels, bus ratings, mains and source breakers.

one-line-panel-bus · gps-one-line-panel-bus · 3 blocker checks
065

Service path and point of interconnection

Show the exact meter/service/utility order and permitted POI method.

one-line-service-poi · gps-one-line-service-poi · 3 blocker checks
066

Grounding and bonding path

Show grounding electrode, equipment grounding, bonding and neutral relationships.

one-line-grounding-bonding · gps-one-line-grounding-bonding · 3 blocker checks
067

Conductor and raceway tags

Assign stable tags linking every circuit to the calculated conductor schedule.

one-line-conductor-tags · gps-one-line-conductor-tags · 3 blocker checks
E-CALCE-1.1 / E-2.1 · ratings, calculations and schedulesE-1.1, E-1.2 or E-2.110/10 mapped
068

Module/source rating table

Tabulate exact source ratings used by calculations.

calc-module-ratings · gps-calc-module-ratings · 3 blocker checks
069

System summary schedule

Summarize counts, DC/AC power, branches/strings and storage/EV ratings.

calc-system-summary · gps-calc-system-summary · 3 blocker checks
070

Inverter/ESS operating ratings

Tabulate input/output windows, currents, power and operating modes.

calc-inverter-ess-ratings · gps-calc-inverter-ess-ratings · 3 blocker checks
071

Design temperatures and corrections

Record authoritative temperature source and correction inputs.

calc-design-temperatures · gps-calc-design-temperatures · 3 blocker checks
072

String and MPPT calculations

Calculate Voc/Vmp/Isc/Imp and MPPT assignments for every string/branch.

calc-string-mppt · gps-calc-string-mppt · 3 blocker checks
073

Conductor ampacity

Calculate continuous load, correction, adjustment, terminal and protection limits per circuit.

calc-conductor-ampacity · gps-calc-conductor-ampacity · 3 blocker checks
074

Overcurrent protection sizing

Size and validate every source/load OCPD against circuit/equipment limits.

calc-overcurrent-protection · gps-calc-overcurrent-protection · 3 blocker checks
075

Interconnection calculations

Validate load-side, supply-side or other POI method against exact service facts.

calc-interconnection · gps-calc-interconnection · 3 blocker checks
076

Conduit and conductor schedule

Issue a circuit-by-circuit schedule for conductors, EGC, raceway, fill and route conditions.

calc-conduit-conductor-schedule · gps-calc-conduit-conductor-schedule · 3 blocker checks
077

Electrical compliance ledger

Expose every mandatory calculation, limit, result and failure without averaging.

calc-compliance-ledger · gps-calc-compliance-ledger · 3 blocker checks
E-2E-2 / E-2.2 · labels, placards and directory mapE-2 or E-2.27/7 mapped
078

Project label artwork

Compose code- and authority-specific label artwork using professional conventions.

label-artwork-library · gps-label-artwork-library · 3 blocker checks
079

Computed label values

Populate maximum voltage/current, source count, ratings and other variable values from calculations.

label-project-values · gps-label-project-values · 3 blocker checks
080

Label installation schedule

Assign each label to specific project equipment/location.

label-installation-locations · gps-label-installation-locations · 3 blocker checks
081

Fire department disconnect markings

Create source/disconnect identification required for emergency response.

label-fire-disconnect · gps-label-fire-disconnect · 3 blocker checks
082

Source and disconnect directory map

Show a site/equipment map locating power sources, service and disconnects.

placard-source-directory · gps-placard-source-directory · 3 blocker checks
083

Fabrication and durability notes

State material, permanence, contrast and mounting requirements.

label-fabrication-notes · gps-label-fabrication-notes · 3 blocker checks
084

Rapid shutdown label/instructions

Create the correct RSD label and diagram for the installed architecture.

label-rapid-shutdown · gps-label-rapid-shutdown · 3 blocker checks
E-3E-3 · measured equipment elevationE-34/6 mapped
085

Power-source disconnect schedule

List disconnects, source types, ratings and field labels beside the elevation.

elevation-disconnect-schedule · gps-elevation-disconnect-schedule · 3 blocker checks
086

Measured equipment arrangement

Draw equipment envelopes on the actual wall/grade context.

elevation-equipment-arrangement · gps-elevation-equipment-arrangement · 3 blocker checks
087

Working and equipment clearances

Dimension required side, front, vertical, source and separation clearances.

elevation-measured-clearances · gps-elevation-measured-clearances · 3 blocker checks
088

Openings, utilities and exposure

Show doors, windows, vents, gas/water equipment, grade and impact hazards.

elevation-openings-exposure · gps-elevation-openings-exposure · 3 blocker checks
089

Elevation conduit routing

Show surface/concealed route intent, entries, transitions and protection.

elevation-conduit-routing · gps-elevation-conduit-routing · 3 blocker checks
090

Mounting surface and support

Document wall/material/support, anchorage and equipment mounting heights.

elevation-mounting-surface · gps-elevation-mounting-surface · 3 blocker checks
EV-1EV-1 · EVSE circuit and installationEV-13/6 mapped
091

EVSE load and circuit

Represent continuous EVSE load, voltage, phase, breaker and circuit topology.

ev-load-circuit · gps-ev-load-circuit · 3 blocker checks
092

Service capacity and load management

Validate added EV load or listed energy-management strategy.

ev-service-capacity · gps-ev-service-capacity · 3 blocker checks
093

EV OCPD and conductors

Size breaker, conductors, EGC and raceway for continuous load and installation conditions.

ev-ocpd-conductors · gps-ev-ocpd-conductors · 3 blocker checks
094

EV route and voltage drop

Model route length/transitions and evaluate voltage drop.

ev-route-length-voltage-drop · gps-ev-route-length-voltage-drop · 3 blocker checks
095

EVSE location and clearances

Locate charger relative to parking, working space, impact and accessibility conditions.

ev-equipment-location-clearance · gps-ev-equipment-location-clearance · 3 blocker checks
096

EVSE exact specification and installation

Bind drawing requirements to the exact listed model and installation instructions.

ev-spec-installation · gps-ev-spec-installation · 3 blocker checks
S-*S-n · dynamic equipment appendixS-1…S-n assigned dynamically6/7 mapped
097

Exact model and variant resolution

Resolve every design component to an exact manufacturer model/variant before attaching documents.

appendix-exact-model-resolution · gps-appendix-exact-model-resolution · 3 blocker checks
098

Official source acquisition

Acquire specifications/instructions from an authoritative, legally retainable source.

appendix-official-document-source · gps-appendix-official-document-source · 3 blocker checks
099

Relevant page selection

Select the pages needed to substantiate design ratings and installation requirements.

appendix-page-selection · gps-appendix-page-selection · 3 blocker checks
100

Parameter-to-page evidence map

Tie each critical design parameter to a document page/section.

appendix-parameter-evidence · gps-appendix-parameter-evidence · 3 blocker checks
101

Artifact hash and integrity

Pin each attached artifact and detect substitutions or corruption.

appendix-hash-integrity · gps-appendix-hash-integrity · 3 blocker checks
102

Bill of materials reconciliation

Reconcile exact equipment, racking and accessory quantities across design and documents.

appendix-bom-reconciliation · gps-appendix-bom-reconciliation · 3 blocker checks
103

Dynamic S-n page ledger

Assign, deduplicate and index appendix sheets dynamically after composition.

appendix-page-ledger · gps-appendix-page-ledger · 3 blocker checks
CROSSCross-sheet · reconciliation and releasecomplete package0/8 mapped
104

Equipment identity reconciliation

Reconcile manufacturer, model, variant and part numbers everywhere.

reconcile-equipment-identity · gps-reconcile-equipment-identity · 3 blocker checks
105

System rating reconciliation

Reconcile DC/AC power, kWh, voltage, current and export values everywhere.

reconcile-system-ratings · gps-reconcile-system-ratings · 3 blocker checks
106

Module, string and branch reconciliation

Reconcile module count and every string/branch/MPPT assignment.

reconcile-module-string-count · gps-reconcile-module-string-count · 3 blocker checks
107

Location and callout reconciliation

Reconcile equipment, disconnect, route, label and elevation locations.

reconcile-location-callouts · gps-reconcile-location-callouts · 3 blocker checks
108

Conductor tag reconciliation

Reconcile one-line/plan tags to calculation and conduit schedules.

reconcile-conductor-tags · gps-reconcile-conductor-tags · 3 blocker checks
109

Label value reconciliation

Reconcile label artwork and placards to computed ratings and topology.

reconcile-label-values · gps-reconcile-label-values · 3 blocker checks
110

Sheet index and appendix reconciliation

Reconcile title blocks, sheet order, drawing index and dynamic appendix ledger.

reconcile-sheet-index · gps-reconcile-sheet-index · 3 blocker checks
111

Revision and metadata reconciliation

Reconcile visible revision, content signature and PDF metadata without leaking stale identities.

reconcile-revision-metadata · gps-reconcile-revision-metadata · 3 blocker checks
Release rule

All applicable atomic checks, all eight reconciliations, and all independent evidence, geometry, structural, electrical, authority, document, drawing and package gates must pass. A 95 score cannot average away one failed hard check.

Roof geometry release standard

Similarity is not accuracy.

A clean outline can still be dimensionally wrong. Every roof model is classified by its evidence, solved in physical units, checked against independent controls, and exported as vectors. Aerial imagery alone stays preliminary.

G1

Remote feasibility

Satellite, aerial, or Solar API evidence for intake and preliminary layout only.

G2

Measured geometry

Machine-readable roof facets with dimensions, pitches, provenance, and residual checks.

G3–G4

Field controlled

Drone/LiDAR with control, survey, or direct field measurement for as-built tolerance.

Release gate

Closed polygons ≤ 1 in · control RMSE ≤ 2 in · no residual > 4 in · independent check dimensions · every edge sourced · every module inside the allowed roof region after setbacks.

Active authority review

City of Los Angeles

The 2026 Los Angeles code basis is active, while the City’s public solar catalogue still exposes older standard-plan materials. GoPlanSets therefore allows evidence-backed draft projects but keeps paid permit export locked until the current route and migrated rules are authoritatively confirmed and independently approved.